HIABC Fall/Winter Series 2019 Cladding # 6 ONLINE
BIR Centre for Excellence
Port Coquitlam, BC V3C 6P8
How to get there
***ONLINE - ON DEMAND WEBINAR 3.5 MRC***
Session 6: Installing alternate cladding and finishes including Masonry Veneer, EIFS, SIPs, ICF & Mass Wall
Masonry Veneer
Shelf Angles & Thermally Broken Shelf Angles, Strap Ties and Masonry Ties, creating the Capillary Break, working with optional exterior insulation (furring, fasteners, sheathing), mortar, Pointing, Weep Holes, truing the wall (the humble hour), and masonry coatings, efflorescence, flashings.
Structural attachment with exterior insulation and moderately heavy cladding, conventional stucco systems on stucco backer or K lath, modified stucco finishes on cement board (STO), Exterior Insulation and Finish System (EIFS) on Mass Wall, control joints, flashings, trim and transitions, and fasteners for moderately heavy cladding attachment.